Svitzer Rock Revetment Remediation

The rock revetment at the Svitzer Tug Base had become unstable over the years. Past attempts to patch with rock and shotcrete had failed and the time had come for a full repair.

As part of this project the following tasks were complete:

  • Relocate floating pontoons, gangways and street furniture.
  • Protect existing services such as fuel lines, water and foam, electricity and telecommunications.
  • Remove existing rock and excess mud
  • Import and place Armour, Filter and geotextiles
  • Import, blast, paint and install 13m long sheet piles.
  • Install concrete capping beams and stormwater infrastructure.

YEAR COMPLETED:

2024

CLIENT:

Port of Brisbane/ Svitzer Australia

CONTRACT VALUE:

DURATION:

6 months

SERVICE:

Civil and Revetment