Previous
Next
Port of Townsville Channel Upgrade Project – Rock Supply
MGN was contracted by the Port of Townsville to test, sort, load and deliver 157,000T of conforming armour from Ravenswood Gold Mine.
The project required 5300 loads to be delivered 140km one way to the Port of Townsville outer seawall project.