Port of Brisbane Surcharge and Wicking Project
The project included the installation of 2 million metres of prefabricated vertical drains (PVDs) and the placement of up to 1 million cubic metres of surcharge material over and area covering 24 hectares.
The PVDs exceeded 45m in length making them the longest installed to date, anywhere in Australia.