Port of Brisbane Reclamation

The Port of Brisbane Pty Ltd is constructed on reclaimed land at various sites including Fisherman Islands, Lytton and Pinkenba. These lands are progressively developed using dredged spoil delivered from the Port’s own dredging fleet.
MGN Civil has been engaged to manage the land based operations associated with the land reclamation. The scope of works is vast but generally includes the 24/7 management of spoil from both the TSHD Brisbane and Ken Harvey, construction of perimeter bunds, installation and removal of both land based and marine pipelines, mud drying management and turbidity management.

YEAR COMPLETED:

2024

CLIENT:

Port of Brisbane Pty Ltd

CONTRACT VALUE:

$millions

DURATION:

Ongoing

SERVICE:

Land Reclamation