Coffs Harbour Regional Boat Ramp Upgrade

  • Extension of the existing breakwater.
  • Widening of the existing boat ramp by two extra lanes.
  • Supply and installation of additional pontoons and supporting piles.
  • Construction of scour protection works within the boat ramp basin.
  • Dredging of the entrance channel and boat ramp basin to provide a suitable bed level for the upgraded boat ramp facility
  • Beach nourishment

YEAR COMPLETED:

2022

CLIENT:

Transport for NSW

CONTRACT VALUE:

$6.2M

DURATION:

8 months

SERVICE:

Breakwater, Boat Ramp, Dredging, Pontoon installation

Contact Us