Previous
Next
Coal and Grain Revetments
MGN Civil has been engaged to remove two dilapidated rock revetments and replace with two new walls to ensure the ongoing protection of land.
Works include
- 22,000T of various rock sourced, delivered and placed
- 10,000T of material removed and reused on various other environmental sites at the Port of Brisbane
- 6,500m2 of installed Geofabric
- Stormwater and concrete works
- Hydrographic Survey