Coal and Grain Revetments

MGN Civil has been engaged to remove two dilapidated rock revetments and replace with two new walls to ensure the ongoing protection of land.

Works include

  • 22,000T of various rock sourced, delivered and placed
  • 10,000T of material removed and reused on various other environmental sites at the Port of Brisbane
  • 6,500m2 of installed Geofabric
  • Stormwater and concrete works
  • Hydrographic Survey

YEAR COMPLETED:

2022

CLIENT:

Port of Brisbane

CONTRACT VALUE:

$1.8M

DURATION:

6 months

SERVICE:

Rock Wall