Southport Yacht Club Superyacht Berthing Facility

As the principal contractor MGN Civil was responsible for the following works:

  • all landside components inclusive of dredging, rock revetment and demolition of existing structures
  • supply and construction of a vertical structural wall and tie back anchoring system
  • construction of berth scour protection at the basin floor and batter stabilization
  • supply and placement of rock
  • marine infrastructure including floating pontoon, mooring system, piles, services, and access gangway
  • precast floating pontoon construction and installation.

YEAR COMPLETED:

2022

CLIENT:

Southport Yacht Club

CONTRACT VALUE:

$8 Million

DURATION:

15 months

SERVICE:

Seawall

Contact Us