Southport Yacht Club Superyacht Berthing Facility
As the principal contractor MGN Civil was responsible for the following works:
- all landside components inclusive of dredging, rock revetment and demolition of existing structures
- supply and construction of a vertical structural wall and tie back anchoring system
- construction of berth scour protection at the basin floor and batter stabilization
- supply and placement of rock
- marine infrastructure including floating pontoon, mooring system, piles, services, and access gangway
- precast floating pontoon construction and installation.